Case Study: One Setup, Five Runs: Tracking Pigs Off the Grid in Oregon
A third-party pig tracking company tracked a full inline inspection (ILI) campaign on a remote 80-mile pipeline in Oregon. The campaign ran three progressive cleaning runs over three days, then a magnetic flux leakage (MFL) inspection took place. After a standby period, an electromagnetic acoustic transducer (EMAT) run followed.